MSDW unit Turnaround Catalyst Changeout

REACTOR

Descriptions

Client: FORMOSA PETROCHEMICAL CORPORATION
Vessel ID: 3.1m
Date: 2018.07
Work scope:
* Gravity dumping
* Spent catalyst storage, screen & recycle (recycle rate reach 99.9%)
* Work under nitrogen
* Scaffolding inside the reactor
* Internal removal, repair & installation
* Flange dry ice cleaning
* Inspection & cleaning
* Catalyst loading (sock & dense)
* Bolt tensioning, bolt torquing, and nut splitting